EMC/Franklin Manufacturing Facility
Franklin, MA
A 720,000 SF high tech manufacturing facility
was designed in a “Flash-Track” mode of construction.
Veitas & Veitas assisted the owner to directly procure over 6,000
tons of structural steel, less than two months after the design team
was released to proceed. Structural design started in late August
of 1997, and steel erection commenced in December of 1997. Steel erected
was topped off in February of 1998. Veitas & Veitas worked closely
with the fabricator and erector to implement continuous changes and
new program requirements. The manufacturing component of the structure
was framed with fifty by fifty foot bays and floor loads on the second
floor of 250 to 400 pounds per square foot.
|