Millipore Corporation –
Clean Room
Jaffrey, NH
This renovation turned the existing warehouse
space into clean room manufacturing space. The renovation included
the addition of a mechanical mezzanine and a second floor office
space within the existing envelope. As a result of the added
areas, the building required seismic upgrading to meet the requirements
of the 2000 IBC.
|